Exterior Renovation / Interior Renovation
North Massapequa Front to Back Split-Level
Renovated the entire 1st floor with front and side extension, and kitchen relocation. Added a 3rd floor master suite with huge vaulted ceilings, and a complete exterior renovation.
Timeline:
4-5 Months